Final | 8/15/2019 | 8/15/2019 | 8/15/2019 | P | PASS |
James Ady
|
|
|
I am here until 3:00. Let me know if I need to schedule it tomorrow. Thanks. Phone #: ###-#### Inspection requested via web by Mark Gibson Final ok
|
Electrical Rough-In | 7/31/2019 | 8/1/2019 | 8/1/2019 | A | PASS |
James Ady
|
|
|
I have the compressor and cold box areas ready for inspection. thanks. Phone #: ###-#### Inspection requested via web by Mark Gibson Areas listed ready for final
|
Electrical Rough-In | 7/23/2019 | 7/24/2019 | 7/24/2019 | A | PASS |
James Ady
|
|
|
would like to look at a few areas at a time instead of whole project. electrical building, prebuilt analyzer building, cooling tower area. if you have any questions please feel free to call. Mark Gibson. thanks. Phone #: ###-#### Inspection requested via web by Mark Gibson Main electrical room, Analyzer cabinet and water cooling tower ok to final.
|
Conference | 5/22/2019 | 5/23/2019 | 5/23/2019 | A | PASS |
James Ady
|
|
|
just want a quick chat about this premanufactured structure. thanks. Phone #: ###-#### Inspection requested via web by Mark Gibson Spoke with contractor. He will fix violations in cabinet. Replace THHN in cable tray with TC rated cable and correct violations in lighting and recep circuits.
|
Electrical Rough-In | 5/21/2019 | 5/22/2019 | 5/22/2019 | A | CANC |
James Ady
|
|
|
site contact mark Gibson ###-#### air product nitrogen plant-east side building 39 Phone #: ###-#### Inspection requested via web by Mark Gibson
|
Conference | 5/22/2019 | 5/22/2019 | 5/22/2019 | P | DONE |
James Ady
|
|
|
site contact mark Gibson ###-#### air product nitrogen plant-east side building 39 Phone #: ###-#### Inspection requested via web by Mark Gibson Need to have PLC/MCC cabinet feild evaluated. Violations were noticed inside. Cabinet was pre-manufactured offsite.
|
Conference | 5/20/2019 | 5/21/2019 | 5/21/2019 | P | PASS |
James Ady
|
|
|
Site Contact is Mark Gibson ###-#### Phone #: ###-#### Inspection requested via web by Toby Groves Talked about inspection of pre-fab equipment in new N2 plant. will call for rough in and check listing
|