Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberELE19-01355
StatusFinaled
Name POWER PLUS INC
Site Address 8000 S FEDERAL WAY
Project Name 
Customer Number1555
ePlanReviewNo
Description
Alteration: Micron ASU E&I Plant
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final8/15/20198/15/20198/15/2019PPASS
DetailsJames Ady
I am here until 3:00. Let me know if I need to schedule it tomorrow. Thanks. Phone #: ###-#### Inspection requested via web by Mark Gibson Final ok
Electrical Rough-In7/31/20198/1/20198/1/2019APASS
DetailsJames Ady
I have the compressor and cold box areas ready for inspection. thanks. Phone #: ###-#### Inspection requested via web by Mark Gibson Areas listed ready for final
Electrical Rough-In7/23/20197/24/20197/24/2019APASS
DetailsJames Ady
would like to look at a few areas at a time instead of whole project. electrical building, prebuilt analyzer building, cooling tower area. if you have any questions please feel free to call. Mark Gibson. thanks. Phone #: ###-#### Inspection requested via web by Mark Gibson Main electrical room, Analyzer cabinet and water cooling tower ok to final.
Conference5/22/20195/23/20195/23/2019APASS
DetailsJames Ady
just want a quick chat about this premanufactured structure. thanks. Phone #: ###-#### Inspection requested via web by Mark Gibson Spoke with contractor. He will fix violations in cabinet. Replace THHN in cable tray with TC rated cable and correct violations in lighting and recep circuits.
Electrical Rough-In5/21/20195/22/20195/22/2019ACANC
DetailsJames Ady
site contact mark Gibson ###-####
air product nitrogen plant-east side building 39 Phone #: ###-#### Inspection requested via web by Mark Gibson
Conference5/22/20195/22/20195/22/2019PDONE
DetailsJames Ady
site contact mark Gibson ###-####
air product nitrogen plant-east side building 39 Phone #: ###-#### Inspection requested via web by Mark Gibson Need to have PLC/MCC cabinet feild evaluated. Violations were noticed inside. Cabinet was pre-manufactured offsite.
Conference5/20/20195/21/20195/21/2019PPASS
DetailsJames Ady
Site Contact is Mark Gibson ###-#### Phone #: ###-#### Inspection requested via web by Toby Groves Talked about inspection of pre-fab equipment in new N2 plant. will call for rough in and check listing