Final | 6/17/2019 | 6/18/2019 | 6/18/2019 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Kurt Carlson Ok final garage and move existing panel so accessible.
|
Final | 6/11/2019 | 6/12/2019 | 6/11/2019 | A | CANC |
Mark Moncarr
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kurt Carlson Inspection cancelled from web by: Kurt Carlson
|
Rough-In Permanent Service | 5/16/2019 | 5/16/2019 | 5/16/2019 | P | PASS |
Mark Moncarr
|
|
|
New service is being set on the back left hand side of the home. Idaho Power denied the existing service due to triplex swing over the roof. Ground rods to be installed, water piping is new poly line, new cable to be run from new service to existing panel, through crawl space. Neutrals and grounds to be separated at existing panel. This will be inspected and power transferred at another time. Phone #: ###-#### Inspection requested via web by Kurt Carlson p/s o/h n ok
|
Rough-In Permanent Service | 5/6/2019 | 5/7/2019 | 5/7/2019 | P | CANC |
Mark Moncarr
|
|
|
Turning branch circuit around in garage. Phone #: ###-#### >> Inspection requested via web by Kurt Carlson Inspection cancelled from web by: Kurt Carlson
|
Electrical Rough-In | 4/23/2019 | 4/24/2019 | 4/24/2019 | A | PASS |
Mark Moncarr
|
|
|
Garage is ready for inspection. Need to look at existing panel located in the little utility closet in the back of the garage. Working clearances is. An issue may need to be flipped around Phone #: ###-#### Inspection requested via web by Kurt Carlson Ok cover garage. Panel in back room area will need to be turned to face in garage as pool equipt surrounds entire work space area in front of panel.
|