Final | 4/29/2019 | 5/3/2019 | 5/3/2019 | A | PASS |
James Ady
|
|
|
final inspection for an addition to an existing solar array; all work done according to approved plans; approved plans on site in the garage at elelctrical panel; the customer will be home for access; Phone #: ###-#### Inspection requested via web by Ryan King Final ok
|
Final | 4/22/2019 | 4/26/2019 | 4/26/2019 | A | NH |
Rock A. Hudson
|
|
|
small addition to solar array complete per stamped/approved plans. The homeowner will be home to give access to the garage/electrical panel. Give the customer a call at ###-#### on your way out. Give me a call if you have any questions about the work, ###-####. Thanks guys Phone #: ###-#### Inspection requested via web by Ryan King Called contact as directed, no answer, owner called after had left area, must recall
|
Electrical Rough-In | 4/22/2019 | 4/23/2019 | 4/23/2019 | A | PASS |
James Ady
|
|
|
listing inspection for solar equipment. Its a 5 panel solar addition to an existing array. An installer will be on site to show panels and optimizers being used. Give me a call on your way out. The installer will be done with work, and just waiting, so the earlier the better! Thanks guys Phone #: ###-#### Inspection requested via web by Ryan King listing only ok
|