Electrical Rough-In | 6/5/2019 | 6/5/2019 | 6/5/2019 | P | PASS |
Eric Story
|
|
|
EQ bonding plane wiring and connections. Access granted through gate on right side of residence Phone #: ###-#### Inspection requested via web by Lars Johnson EQ bonding around perimeter of pool and hot tub+stub to diving board ok to cover
|
Electrical Rough-In | 4/23/2019 | 4/25/2019 | 4/25/2019 | P | PASS |
Eric Story
|
|
|
Underground and bonding for pool/spa Phone #: ###-#### Inspection requested via web by Lars Johnson U/G and four corners and spa bonding ok to cover 4 corners 1 pool cover 1 diving board
|