Final | 5/27/2019 | 5/28/2019 | 5/28/2019 | A | PASS |
Rock A. Hudson
|
|
|
Please call ahead Phone #: ###-#### Inspection requested via web by Kyle Dillon Final ok
|
Final | 5/21/2019 | 5/24/2019 | 5/24/2019 | P | NR |
Rock A. Hudson
|
|
|
Please call ahead Phone #: ###-#### Inspection requested via web by Kyle Dillon Metermain relocated to ground level. Will recall when grounds and neutrals seperation complete in panel. No other alterations allowed in this panel.
|
Rough-In Permanent Service | 5/21/2019 | 5/24/2019 | 5/24/2019 | A | PASS |
Rock A. Hudson
|
|
|
Please call ahead Phone #: ###-#### Inspection requested via web by Kyle Dillon p/s o/h rec ok
|
Conference | 5/13/2019 | 5/15/2019 | 5/15/2019 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Dillon Discussed moving overhead fed meterbase off upper level deck to ground level. No changes to be made to interior panel which is split bus 100 amp. Want to locate meter to ground level, run conduit externally to below where original meter located, run up thru deck floor and LB into existing split bus panel. A max of 6 throws exist, ground rods to be added to grounding electrode system.
|
Conference | 5/9/2019 | 5/14/2019 | 5/13/2019 | A | CANC |
Tom Saunders
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kyle Dillon Inspection cancelled from web by: Kyle Dillon
|
Conference | 5/8/2019 | 5/13/2019 | 5/9/2019 | A | CANC |
Tom Saunders
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kyle Dillon Inspection cancelled from web by: Kyle Dillon
|