Electrical Rough-In | 7/1/2019 | 7/1/2019 | 7/1/2019 | P | CANC |
James Ady
|
|
|
EQ bonding plane wiring and connections Phone #: ###-#### Inspection requested via web by Lars Johnson
|
Electrical Rough-In | 6/27/2019 | 6/28/2019 | 6/28/2019 | A | PASS |
James Ady
|
|
|
EQ bonding plane wiring and connections. Bonding of gas pipe for future fire pit. Access granted through construction entrance off of canal behind residence. Phone #: ###-#### Inspection requested via web by Lars Johnson EQ bond only ok to cover
|
Electrical Rough-In | 5/2/2019 | 5/2/2019 | 5/2/2019 | P | PASS |
James Ady
|
|
|
Underground and bonding for swimming pool. Access through hole in back fence on canal access road. Dogs are locked in house. Phone #: ###-#### Inspection requested via web by Lars Johnson Underground and corner bond only ok to cover
|