Final | 5/10/2019 | 5/13/2019 | 5/13/2019 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by BRS Permitting Final fro solar array install ok to cover
|
Electrical Rough-In | 5/8/2019 | 5/9/2019 | 5/9/2019 | A | PASS |
Eric Story
|
|
|
If possible, please call the above number before heading to the jobsite. Thank you! Phone #: ###-#### Inspection requested via web by BRS Permitting Verified U/L listing of new typw solar panels and scope of work....
|