Final | 3/23/2020 | 3/23/2020 | 3/23/2020 | P | PASS |
James Ady
|
|
|
Contact: Erick Baker Phone #: ###-#### Inspection requested via web by Deb Gooden All required lighting outlets have been programed to wall switches, All non required light openings in stone work have been Safed and Blanked(4 front columns and 8 back columns) A/C's have not been set but Disc. in place and all stubs safed and blanked Receps added in pantry. Final ok
|
Final | 3/13/2020 | 3/16/2020 | 3/16/2020 | P | NR |
James Ady
|
|
|
Please contact Erick Baker at ###-####, he is the electrician on site. Phone #: ###-#### Inspection requested via web by Deb Gooden Add receps in pantry, Remove open bulb light from Master closet, Safe off all stubbed wires around exterior of home, Finish programing lighting control(Need all code required lights to opperate from switch location, Safe all wire stubbs inside home.
|
Conference | 1/29/2020 | 1/30/2020 | 1/30/2020 | A | PASS |
James Ady
|
|
|
on site contact Erick Baker consult about cabinet lighting Thank you Phone #: ###-#### Inspection requested via web by Deb Gooden Discussed Counter/ work surface in laundry room. Recep not required. Disussed layout for receps on Kitchen countertop. 1 wall recep left of sink, 2 pop ups,1 right and 1 left of sink and 2 undercab receps.
|
Electrical Rough-In | 11/22/2019 | 11/25/2019 | 11/25/2019 | A | PASS |
James Ady
|
|
|
Contact: Erick Baker. Floor heat inspection please Phone #: ###-#### Inspection requested via web by Deb Gooden Up master bath floor heat only ok to cover
|
Electrical Rough-In | 11/15/2019 | 11/18/2019 | 11/18/2019 | P | PASS |
Rock A. Hudson
|
|
|
Contact: Erick Baker Floor heat inspection main floor master bath please Phone #: ###-#### Inspection requested via web by Deb Gooden Master floor heat rough in ok cover
|
Electrical Rough-In | 11/13/2019 | 11/14/2019 | 11/14/2019 | A | PASS |
James Ady
|
|
|
Contact: Erick Baker... Floor heat inspection for guest bathroom off of kitchen Phone #: ###-#### Inspection requested via web by Deb Gooden Guest bathroom only ok to cover
|
Permanent Service | 8/5/2019 | 8/6/2019 | 8/6/2019 | A | PASS |
Eric Story
|
|
|
Contact: Erick Baker Phone #: ###-#### Inspection requested via web by Deb Gooden p/s u/g n ok
|
Electrical Rough-In | 7/2/2019 | 7/3/2019 | 7/3/2019 | P | PASS |
James Ady
|
|
|
Contact: Erick Baker Phone #: ###-#### Inspection requested via web by Deb Gooden Rough in only No service at this time. OK to cover
|