Final | 7/15/2019 | 7/16/2019 | 7/16/2019 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Angela Stears Correction fixed final for pool ok, No card on site to sign for pool
|
Final | 7/15/2019 | 7/15/2019 | 7/15/2019 | P | FAIL |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Angela Stears 680 Pool bonding equipotential plan shall be hook up for final
|
Electrical Rough-In | 6/18/2019 | 6/18/2019 | 6/18/2019 | P | PASS |
Eric Story
|
|
|
This is for a Pool Deck Bonding Inspection Please call Jared with any questions at ###-#### Thank you! Phone #: ###-#### Inspection requested via web by Angela Stears EQ bonding around pool with 2 flag pole and handicap elevator ok to cover
|
Electrical Rough-In | 5/2/2019 | 5/2/2019 | 5/2/2019 | P | PASS |
Eric Story
|
|
|
Pool bonding re-inspect Proper U/L listed connetors installed, 6 points stubbed out for bonding all 4 corners done and misc bonds
|
Electrical Rough-In | 5/1/2019 | 5/2/2019 | 5/2/2019 | A | FAIL |
Eric Story
|
|
|
We need an electrical inspection for underground electrical and rebar so the pool can be covered. Thank you Phone #: ###-#### Inspection requested via web by Angela Stears 110.3 Products used shall be U/L listed and marked for direct burial(ground clamps are not marked)
|