Final | 11/25/2019 | 11/26/2019 | 11/26/2019 | P | PASS |
Eric Story
|
|
|
Jason will be on site ###-#### Phone #: ###-#### Inspection requested via web by robert feller No occ c ard on site-Final ok
|
Electrical Rough-In | 11/14/2019 | 11/15/2019 | 11/15/2019 | A | PASS |
Eric Story
|
|
|
Inspection to cover ceiling, Jason will be on site tomorrow ###-#### Phone #: ###-#### Inspection requested via web by robert feller Suspended ceiling ok to cover
|
Electrical Rough-In | 10/23/2019 | 10/24/2019 | 10/24/2019 | P | PASS |
Eric Story
|
|
|
Need trench inspected. North west play ground area Phone #: ###-#### Inspection requested via web by robert feller u/g for data conduits ok
|
Electrical Rough-In | 9/18/2019 | 9/19/2019 | 9/19/2019 | A | PASS |
Eric Story
|
|
|
This is for a trench inspection Phone #: ###-#### Inspection requested via web by robert feller U/G feeds to new cafeteria ok to cover
|
Conference | 8/21/2019 | 8/22/2019 | 8/22/2019 | A | DONE |
Eric Story
|
|
|
Need consultation for underground electrical Phone #: ###-#### Inspection requested via web by robert feller Discussed U/G from cafeteria to school with an old existing septic tank, depth cannot be reached and will allow 2" of concrete to be poured on top of conduits if tank is not removed
|
Electrical Rough-In | 7/31/2019 | 7/31/2019 | 7/31/2019 | P | PASS |
Eric Story
|
|
|
The new building is in the back of the school Phone #: ###-#### Inspection requested via web by robert feller Walls@hard lids only ok to cover
|
Electrical Rough-In | 5/7/2019 | 5/7/2019 | 5/7/2019 | P | PASS |
Eric Story
|
|
|
We are on site need under slab conduits inspected and ufer Phone #: ###-#### Inspection requested via web by robert feller U/G slab conduits (secondary's and data and grounding to uffer and to fire riser) ok to cover
|