Final | 5/10/2019 | 5/13/2019 | 5/13/2019 | A | PASS |
James Ady
|
|
|
For panel upgrade from old 70 amp Bulldog Pushmatic to a new 100 amp panel. Please call homeowner with ETA at 2085708007. Phone #: ###-#### Inspection requested via web by Dan Hilke Final ok
|
Permanent Service | 5/7/2019 | 5/8/2019 | 5/8/2019 | P | PASS |
Rock A. Hudson
|
|
|
For service panel replacement. Power disconnect is scheduled for 11-12, and we need to get inspected and restore power same day. If you call or text early afternoon I can have an idea what time we will be ready for inspection. Grounding is ready, shouldn''''t take too long. Phone #: ###-#### Inspection requested via web by Dan Hilke 327 approved service entrance conductors ok to pass through 12' of conduit to interior panel that is located 2' behind meter base in a small electrical room. Also central air being added to residence. p/s o/h rec ok
|
Permanent Service | 5/7/2019 | 5/7/2019 | 5/7/2019 | P | CANC |
Tom Saunders
|
|
|
For service panel replacement. Power disconnect is scheduled for 11-12, and we need to get inspected and restore power same day. If you call or text early afternoon I can have an idea what time we will be ready for inspection. Grounding is ready, shouldn''t take too long. Phone #: ###-#### >> Inspection requested via web by Dan Hilke Inspection cancelled from web by: Dan Hilke
|
Permanent Service | 5/6/2019 | 5/7/2019 | 5/7/2019 | P | CANC |
Mark Moncarr
|
|
|
This is for changing a service panel, and we need to reconnect in the afternoon. If you call or text, by noon I should be able to estimate when we''ll be ready for inspection. Phone #: ###-#### >> Inspection requested via web by Dan Hilke Inspection cancelled from web by: Dan Hilke
|