Final | 6/4/2019 | 6/5/2019 | 6/5/2019 | A | PASS |
James Ady
|
|
|
In-ground spa electrical final Phone #: ###-#### Inspection requested via web by Lars Johnson Corrections made final ok
|
Final | 6/3/2019 | 6/3/2019 | 6/3/2019 | P | FAIL |
James Ady
|
|
|
In-ground spa and equipment final Phone #: ###-#### Inspection requested via web by Lars Johnson 680.41. Emergncy switch shall be installed. 352.30A and B. PVC shall be supported. (From 2gang bell box to pool panel.)
|
Electrical Rough-In | 5/21/2019 | 5/21/2019 | 5/21/2019 | P | PASS |
James Ady
|
|
|
EQ bonding plane wiring and connections for in-ground spa Phone #: ###-#### Inspection requested via web by Lars Johnson EQ bond around hot tub ok to cover
|
Electrical Rough-In | 5/7/2019 | 5/10/2019 | 5/10/2019 | A | PASS |
James Ady
|
|
|
Partial underground and bonding for in-ground spa Phone #: ###-#### Inspection requested via web by Lars Johnson Underground and corner bonds only ok to cover
|