Final | 8/7/2019 | 8/12/2019 | 8/12/2019 | A | PASS |
James Ady
|
|
|
Final on swimming pool Owner will be home Phone #: ###-#### Inspection requested via web by Kevin Koomler pool final ok
|
Electrical Rough-In | 6/20/2019 | 6/21/2019 | 6/21/2019 | A | PASS |
James Ady
|
|
|
Equipotential and potting The west gate will be open. Phone #: ###-#### Inspection requested via web by Kevin Koomler eq bond only ok to cover
|
Electrical Rough-In | 5/10/2019 | 5/13/2019 | 5/13/2019 | A | PASS |
James Ady
|
|
|
bonding and underground for pool // Kevin Phone #: ###-#### Underground and coner bonds around hot tub and pool ok to cover
|