Final | 6/6/2019 | 6/7/2019 | 6/7/2019 | A | PART |
Tom Saunders
|
|
|
BME shuts down for lunch at 11. If we could make that time, that would be awesome. If not, please call Doug at ###-#### to let him know what time. He wants to be there. Thanks Phone #: ###-#### Inspection requested via web by Barbara Szurgot... partial final....waiting on blackards being made and installed for panels and available fault current for service will send pictures when applied
|
Permanent Service | 5/21/2019 | 5/28/2019 | 5/28/2019 | A | PASS |
Rock A. Hudson
|
|
|
We would like to request inspector to be there by 8:00 am. Idaho Power coming to turn power back on to business at 8. Phone #: ###-#### Inspection requested via web by Barbara Szurgot Compressor and 1 sub panel fed with 2/0, need fuse down or increase wire size. Strapping needed thru out. Not sure if GFCI protection has ever been checked for automotive repair. p/s u/g rec ok
|
Conference | 5/9/2019 | 5/10/2019 | 5/10/2019 | A | DONE |
Eric Story
|
|
|
I need to meet inspector at this job site to go over a plan before we start work. Phone #: ###-#### Inspection requested via web by Barbara Szurgot Discussed service change on 480/277V 800 amp service to be change out on memorial day weekend.... Building steel will be grounded and need to verify main grounding source in new service..... Gear will be less depth then what is currently install to maintain work space clearences.... All panels in shop to be switched out and was told no area of classification at this time as no storage of fuel is apparent....
|