Final | 7/10/2019 | 7/11/2019 | 7/11/2019 | A | PASS |
Eric Story
|
|
|
Inspection requested via web by Derik Sutton Final ok
|
Final | 6/13/2019 | 6/13/2019 | 6/13/2019 | P | PART |
Tom Saunders
|
|
|
Wires capped and taped off on exterior wiring inside terminated into outlets Phone #: ###-#### Inspection requested via web by Derik Sutton... lobby area lighting and bathrooms complete exterior lighting safed off and out of reach of customers...will be completed within week stated by contractor
|
Final | 6/13/2019 | 6/13/2019 | 6/13/2019 | A | NR |
Tom Saunders
|
|
|
Partial final- interior of building complete. Will complete exterior next week when it’s ready for us. Thankyou Phone #: ###-#### Inspection requested via web by Derik Sutton...
exterior wires need safed off away from contact interior lobby not complete...exposed wiring not complete
|
Electrical Rough-In | 6/11/2019 | 6/11/2019 | 6/11/2019 | P | PASS |
Tom Saunders
|
|
|
Inspection requested via web by Derik Sutton... corrections made ceiling grid ok to cover verify outlet by bathroom removed at final
|
Electrical Rough-In | 6/10/2019 | 6/11/2019 | 6/11/2019 | A | FAIL |
Eric Story
|
|
|
Above grid inspection Inspection requested via web by Derik Sutton Luminaires in suspended ceilings shall be supported to building structure, cans in lobby need supported
|