Final | 7/18/2019 | 7/18/2019 | 7/18/2019 | P | PASS |
Tom Saunders
|
|
|
Hope this is in time, didn''t know that rough in inspections are required. Thank you, Ardis Phone #: ###-#### Inspection requested via web by Ardis Cox...signs complete...ok to final
|
Electrical Rough-In | 7/18/2019 | 7/18/2019 | 7/18/2019 | P | PASS |
Tom Saunders
|
|
|
Hope this is in time, didn''t know that rough in inspections are required. Thank you, Ardis Phone #: ###-#### Inspection requested via web by Ardis Cox...UL listing verified and disconnect from ground...future inspections will need to be scheduled before installation and done at ground level
|