Final | 6/17/2019 | 6/17/2019 | 6/17/2019 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Craig Korell Final ok
|
Electrical Rough-In | 5/28/2019 | 5/28/2019 | 5/28/2019 | P | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Craig Korell Bathroom ok to cover
|
Electrical Rough-In | 5/23/2019 | 5/24/2019 | 5/24/2019 | P | FAIL |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Craig Korell 210.11C3 Bath receps shall be 20A. (need to add 20A circuit for master vanity)
|