Final | 5/22/2019 | 5/23/2019 | 5/23/2019 | P | PASS |
Rock A. Hudson
|
|
|
Mackie- inspection for carnival rides and misc. games Phone #: ###-#### Walked all rides and concession trailers from power supply to main disconnecting means of each ride, tent, trailer, and concession. Disconnecting means all present and readily accessible. Cords all have trip protection carpets installed. Final ok
|
Temporary Service | 5/22/2019 | 5/23/2019 | 5/23/2019 | P | DONE |
Rock A. Hudson
|
|
|
This is a 2 day carnival at the Bose town center mall. Inspection requested for amusement temporary power. A scheduled time is necessary for contractor to meet inspector there. Phone #: ###-#### Inspection requested via web by David Mackey No temp service power, all generated on site,
|