Permit NumberELE19-01914
StatusFinaled
Name EVENGREEN TECHNOLOGY INC
Site Address 1330 E EXCHANGE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Alteration: solar install
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final6/4/20196/5/20196/5/2019PPASS
DetailsJames Ady
Ready for re-inspection any time after 12 noon.
The service ground has been relocated to the building steel. Phone #: ###-#### Inspection requested via web by Ryan King final ok
Permanent Service6/5/20196/5/20196/5/2019PPASS
DetailsJames Ady
Ready for re-inspection any time after 12 noon.
The service ground has been relocated to the building steel. Phone #: ###-#### Inspection requested via web by Ryan King p/s u/g n ok
Final6/3/20196/4/20196/4/2019PFAIL
DetailsJames Ady
Install complete per approved plans; the stamped and approved plans are on site;
For any questions about the work done for this project, call Jed at ###-####; For any questions about the plans or design, call Ryan at ###-####;

The job site is an open site, still under construction, and all our work is exposed. There is a mezzanine inside with a service ladder so you can see our raceways inside as well.

thanks guys
Phone #: ###-#### Inspection requested via web by Ryan King 690.47. PV equipment shall be connected to grounding electrode system.(CT can is not bonded. Connect to red iron or ufer) 250.58. Where supplied by a seperate service. The same grounding electrode system shall be used. 250.24 The grounding electrode conductor shall terminate at an accesible point on the load side of service conductors and on the same bus or terminal as the grounded conductor. (remove grounding conductor from meter base to Fused Disc., Remove Jumper from CT can to Breaker panel. Install Grounding electrode conductor from Fused disc. to existing grounding electrod system. Leave Bonding bushing installed on EMT from meter to Fused disc.)
Electrical Rough-In5/23/20195/24/20195/24/2019APASS
DetailsJames Ady
Listing inspection for solar equipment;
It''s the first day for installing the solar panels, so all equipment is down and available; the inverters and empty raceway is exterior and ready to be inspected; thanks guys
Phone #: ###-#### Inspection requested via web by Ryan King listing only ok