Final | 7/26/2019 | 7/29/2019 | 7/29/2019 | A | PASS |
James Ady
|
|
|
Contact: Jasper McGrew Phone #: ###-#### Inspection requested via web by Deb Gooden No sign off sheet onsite final ok
|
Electrical Rough-In | 7/26/2019 | 7/29/2019 | 7/29/2019 | A | PASS |
James Ady
|
|
|
Jasper Phone #: ###-#### Corrections made ceiling ok to cover
|
Electrical Rough-In | 7/25/2019 | 7/26/2019 | 7/26/2019 | A | FAIL |
James Ady
|
|
|
Contact: Jasper McGrew.... ceiling inspection please Phone #: ###-#### Inspection requested via web by Deb Gooden 314.25 Boxes shall have covers. (Above door in showroom.) Address is incorrect. Re-call when changed and attached to correct BLD
|
Electrical Rough-In | 5/28/2019 | 5/28/2019 | 5/28/2019 | P | PASS |
Eric Story
|
|
|
also look at floor box / Ryan Phone #: ###-#### Walls and floor box u/g ok to cover. Unit #is actually 511/507
|