Final | 6/5/2019 | 6/6/2019 | 6/6/2019 | A | PASS |
Eric Story
|
|
|
Jim Phone #: ###-#### Final ok
|
Conference | 5/24/2019 | 5/24/2019 | 5/24/2019 | P | PASS |
James Ady
|
|
|
Jim Phone #: ###-#### This is a permit to correct corrections under ele19-00687. Kitchen was not under contractors scope of work. Met with owner to discuss kitchen counter requirments. Kitchen counter layout was changed from original design. 12 counter to right of range needs recep and counter to left of sink needs recep within 24in of end of cabinet. Informed owner mounting recep to bottom of upper cabinet is ok
|