Final | 8/1/2019 | 8/2/2019 | 8/2/2019 | P | PASS |
Eric Story
|
|
|
Tim Phone #: ###-#### Solar Array final ok
|
Electrical Rough-In | 8/1/2019 | 8/2/2019 | 8/2/2019 | P | PASS |
Eric Story
|
|
|
Tim Phone #: ###-#### Verified U/L listing of all solar array equipment
|
Final | 6/18/2019 | 6/20/2019 | 6/20/2019 | A | FAIL |
Eric Story
|
|
|
Please notify Tim of time/changes. He is traveling from Twin and would like to do around 9:00 am if possible. His number is ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Amy Simms Need BLD permit and also must have a rough-in inspection proir to install, Need material removed from roof and need approved plans on site.....
|