Final | 8/13/2019 | 8/14/2019 | 8/14/2019 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Ryan Wilson Ok final.
|
Permanent Service | 6/20/2019 | 6/21/2019 | 6/21/2019 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Ryan Wilson On a few occasions I have allowed energize service for locations with a slight difference of depth for working clearance. A fence was needed to divide the properties. If they moved the fence to allow for maximum working clearance, the service would now be on the outside of the fence, and accessible to the public from the alley way. Homeowners would not have a readily accessible opportunity to their breakers. p/s o/h n ok
|
Conference | 6/20/2019 | 6/20/2019 | 6/20/2019 | P | DONE |
Mark Moncarr
|
|
|
Can we meet on site at 1pm? Ryan Phone #: ###-#### Inspection requested via web by Ryan Wilson Discussed service location.
|
Rough-In Permanent Service | 6/4/2019 | 6/5/2019 | 6/5/2019 | A | CANC |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Ryan Wilson
|
Permanent Service | 6/5/2019 | 6/5/2019 | 6/5/2019 | P | FAIL |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Ryan Wilson As Per IDPCO shall maintain 36" of clearence from meter 225.32 Main disc means shall be provided when conductors enter a building or seperate structure
|
Electrical Rough-In | 6/5/2019 | 6/5/2019 | 6/5/2019 | P | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Ryan Wilson House ok to cover
|