Final | 7/19/2019 | 7/22/2019 | 7/22/2019 | A | FAIL |
Tom Saunders
|
|
|
power to sign. Phone #: ###-#### Inspection requested via web by Kendra Lanham.. 1) rough in inspection other then underground shall be schedule before final...material used and wiring methods need verified 2) access to panel to verify panel labelling and circuit rating ok
|
Electrical Rough-In | 6/11/2019 | 6/12/2019 | 6/12/2019 | A | PASS |
Eric Story
|
|
|
Inspect underground conduit to new sign. Phone #: ###-#### Inspection requested via web by Kendra Lanham U/G to new sign ok to cover
|