Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberELE19-02063
StatusFinaled
Name CHALLENGER COMPANIES
Site Address 201 N PHILLIPPI ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Addition: Electrical installation on new Vapor Recovery Skip and associated instrumentation
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final7/7/20207/7/20207/7/2020PPASS
DetailsRock A. Hudson
Please Call Adam at number listed an hour before arrival to site for entry into facility Phone #: ###-#### Inspection requested via web by Tye Thomas Evaperator recovery system designed, assembled off site and shipped to this location. All electrical has poured seal off fittings and performance testing completed and posted on equipment. Arc flash warnings in place. Final ok
Conference8/1/20198/5/20198/5/2019APASS
DetailsRock A. Hudson
Please call adam at the number listed for entry into plant Phone #: ###-#### Inspection requested via web by Tye Thomas
Discussed if an equipment grounding conductor will be required from new service disconnect to existing office building for reconnecting power.
250.32 (B)(1)ex 1-2. Equipment grounding conductors not required for existing building that were compliant with previous revisions of this code provided it complies with-
1-No original equipment grounding conductor installed.
2-No other metallic connection between service and remote building.
3- Ground fault protection for equipment has not been installed on suppy side of the feeders.
And grounded conductor is of sufficient size required be 220.61 and 250.122.
Also discussed if seal offs would be required for 2" conduits on skid to as control panel board. Return to engineer to verify this area of classification and correct if needed.
Electrical Rough-In7/2/20197/3/20197/3/2019APASS
DetailsEric Story
Please call Mike at number listed for entry into facility Phone #: ###-#### Inspection requested via web by Tye Thomas
U/G and ground as marked on EC print ok to cover
Electrical Rough-In6/21/20196/24/20196/24/2019APASS
DetailsRock A. Hudson
Please call mike at number listed for entry into facility. Phone #: ###-#### Inspection requested via web by Tye Thomas
Underground stubs out of skid as noted on contractor print rough in ok cover
Electrical Rough-In6/20/20196/21/20196/20/2019PCANC
DetailsRock A. Hudson
Please call mike @ number listed for entrance into facility Phone #: ###-#### >> Inspection requested via web by Tye Thomas Inspection cancelled from web by: Tye Thomas
Electrical Rough-In6/19/20196/20/20196/20/2019ANR
DetailsRock A. Hudson
Please call mike at number listed for entrance to facility Phone #: ###-#### Inspection requested via web by Tye Thomas
Wanted inspection for 6-21-19. Will recall
Electrical Rough-In6/11/20196/12/20196/12/2019PPASS
DetailsRock A. Hudson
Electrical Underground Inspection
Please call mike at number listed for entry into plant. Phone #: ###-#### Inspection requested via web by Tye Thomas
Area of classification from east side of jet filter pad to west class 1 div 2, east of jet filter pad unclassified. Underground from transformer to east side of jet filter pad rough in ok cover