Final | 7/11/2019 | 7/12/2019 | 7/12/2019 | A | PASS |
Mark Moncarr
|
|
|
Please "final" floor heat with home final inspection also requested for this morning if inspector feels final can pass on both. Home open. Thank you Phone #: ###-#### Inspection requested via web by Paula Gratiot Ok final. All floor heat funcfions properly.
|
Electrical Rough-In | 6/11/2019 | 6/12/2019 | 6/12/2019 | A | PASS |
Mark Moncarr
|
|
|
Floor Heat Rough-In Inspection. 3 locations. Master bath, UL bath and LL bath Thanks you Phone #: ###-#### Inspection requested via web by Paula Gratiot Ok cover flr heat 3 locations.
|