Final | 8/15/2019 | 8/15/2019 | 8/15/2019 | P | PASS |
Tom Saunders
|
|
|
Corrections made building is open Phone #: ###-#### Inspection requested via web by Kevin Oderkirk...corrections made...ok to final
|
Final | 8/14/2019 | 8/14/2019 | 8/14/2019 | P | FAIL |
Rock A. Hudson
|
|
|
Building is open Phone #: ###-#### Inspection requested via web by Kevin Oderkirk 110.3- 2 receptacles not working in imaging room. 210.8(B)- In other than dwelling units 120 volt, 15 and 20 amp receptacles located with in 6' of a sink shall have GFCI protection. Refer receptacle and exam rm receptacles. 406.12(5)- Tamper resistant receptacles shall be installed in business offices, corridors, waiting rooms and similar areas.
|
Electrical Rough-In | 7/19/2019 | 7/19/2019 | 7/22/2019 | P | PASS |
Daryl DeGrange
|
|
|
rough-in ok cover ceiling grid
|
Electrical Rough-In | 6/12/2019 | 6/12/2019 | 6/12/2019 | P | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Oderkirk... suite 103 rough new walls only ok to cover will need verification that reduntant ground installed in existing outlets in exam rm exterior walls at next rough-in inspection
|