Final | 3/17/2020 | 3/18/2020 | 3/18/2020 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Barbara Szurgot Ok final.
|
Final | 3/13/2020 | 3/16/2020 | 3/16/2020 | P | NR |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Barbara Szurgot
|
Electrical Rough-In | 7/29/2019 | 7/29/2019 | 7/29/2019 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Barbara Szurgot Ok cover detached structure, kitch existing bath, laundry.
|
Permanent Service | 7/3/2019 | 7/3/2019 | 7/3/2019 | P | PASS |
Mark Moncarr
|
|
|
Please inspect as soon after lunch as possible, so we can get Idaho power to rehook. Thanks Phone #: ###-#### Inspection requested via web by Barbara Szurgot p/s u/g n ok
|
Rough-In Permanent Service | 6/24/2019 | 6/25/2019 | 6/25/2019 | A | CANC |
Mark Moncarr
|
|
|
Service change to be done at later time. Just want to energize new meter. Please call Doug if you have any questions. ###-#### Phone #: ###-#### Inspection requested via web by Barbara Szurgot Spoke with Doug. He is going to wait until IDP disconnects so he can move new meter base in existing location. No energize.
|
Electrical Rough-In | 6/12/2019 | 6/13/2019 | 6/13/2019 | A | PASS |
Mark Moncarr
|
|
|
trench inspection between house and new building Phone #: ###-#### Inspection requested via web by Barbara Szurgot Ok cover grd work.
|