Final | 9/24/2019 | 9/25/2019 | 9/25/2019 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Perez Ok final
|
Electrical Rough-In | 8/12/2019 | 8/13/2019 | 8/13/2019 | A | PASS |
Mark Moncarr
|
|
|
###-#### Re-scheduled for 8/13, had a couple of questions 2 rooftop A/C units 60max. 60a fuses installed with #6.
|
Electrical Rough-In | 8/12/2019 | 8/12/2019 | 8/12/2019 | P | CANC |
Mark Moncarr
|
|
|
Please inspect new AC unit locations and connections. General Contractor would like them inspected for use. Phone #: ###-#### Inspection requested via web by Kevin Perez Re-scheduled for 8/13, had a couple of questions.
|
Electrical Rough-In | 7/24/2019 | 7/26/2019 | 7/26/2019 | A | PASS |
Rock A. Hudson
|
|
|
Underground inspection Phone #: ###-#### Inspection requested via web by Kevin Perez Green tag posted at junction box just above where conduit enters ground off back alley. Underground rough in ok cover
|
Electrical Rough-In | 6/18/2019 | 6/21/2019 | 6/21/2019 | A | PASS |
Mark Moncarr
|
|
|
Rough-In inspection for stage area. Phone #: ###-#### Inspection requested via web by Kevin Perez Ok cover stage area. Multiple drops in floor to be pulled up once floor is done. Floor boxes will be installed.
|