Electrical Rough-In | 4/1/2020 | 4/1/2020 | 4/1/2020 | P | PASS |
James Ady
|
|
|
Firewall receptacles re installed Phone #: ###-#### Inspection requested via web by Matthew White Kitchen firewall only ok to cover
|
Electrical Rough-In | 3/4/2020 | 3/6/2020 | 3/6/2020 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Matthew White Unit 58. Misc lighting and receps. Master bed, bbath and kitchen ok to cover. (Note: Owner stated the house will be re-plugged and switched)
|