Final | 7/2/2020 | 7/2/2020 | 7/2/2020 | A | PASS |
James Ady
|
|
|
Gate code #2390 Phone #: ###-#### Inspection requested via web by Therrin Robertson Final ok
|
Final | 6/30/2020 | 6/30/2020 | 6/30/2020 | A | PART |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Therrin Robertson All lights are funtioning. Missing Bulb in exterior Garage mandoor. GFPE breaker needed for Heat trace as per 426.28 COVID-19 has been an issue in progress. Partial Final only ok
|
Electrical Rough-In | 1/9/2020 | 1/10/2020 | 1/10/2020 | A | PASS |
James Ady
|
|
|
Floor Heat Gate code #2390 Phone #: ###-#### Inspection requested via web by Therrin Robertson Master bath, laundry room and cat room ok to cover
|
Rough-In Permanent Service | 6/23/2019 | 6/24/2019 | 6/24/2019 | A | PASS |
James Ady
|
|
|
Gate code #2390 Phone #: ###-#### Inspection requested via web by Therrin Robertson rough in ok p/s u/g n ok
|