Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberELE19-02366
StatusFinaled
Name NEW LEAF ELECTRIC
Site Address 1411 E FORT ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Alteration or Repair: Electrical support for remodel, moving floor heat circuit to new master bath, extending bathroom circuit to new master bath, adding appropriate lights and switches.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final8/22/20198/23/20198/23/2019APASS
DetailsRock A. Hudson
Things from last inspection have been resolved Phone #: ###-#### Inspection requested via web by Dan Hilke
Corrections complete. Final ok
Final8/21/20198/21/20198/21/2019AFAIL
DetailsDaryl DeGrange
Master bedroom/bathroom remodel. Phone #: ###-#### Inspection requested via web by Dan Hilke Master bedrrom receptacle near walk-in closet- no power Master bath counter recptacles, and receptacle under cabnet show reverse hot and ground. Master bathroom receptacle in cabnet near window has no GFCI protection.
Electrical Rough-In8/5/20198/6/20198/6/2019PPASS
DetailsJames Ady
Phone #: ###-#### Inspection requested via web by Dan Hilke Underground from house to shed only ok to cover
Electrical Rough-In7/18/20197/18/20197/18/2019PPASS
DetailsJames Ady
For electric floor heat installation.
Please call ahead. Phone #: ###-#### Inspection requested via web by Dan Hilke Floor heat only ok to cover
Electrical Rough-In6/25/20196/26/20196/26/2019APASS
DetailsDaryl DeGrange
Please let me know 30 minutes before arrival so I can get there. Phone #: ###-#### Inspection requested via web by Dan Hilke Rough-in ok cover main and master bathroom, floor heat cabling in master bath not installed at this time.