Final | 2/9/2020 | 2/10/2020 | 2/10/2020 | A | PASS |
Eric Story
|
|
|
Keys to each unit are in front weatherproof outlets at each front door. Both units are ready for final. Phone #: ###-#### Inspection requested via web by Cevyn Recla Final ok
|
Rough-In Permanent Service | 9/19/2019 | 9/19/2019 | 9/19/2019 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Cevyn Recla Ok cover. p/s o/h n ok
|
Electrical Rough-In | 6/26/2019 | 6/26/2019 | 6/26/2019 | P | PASS |
Mark Moncarr
|
|
|
Foundation was poured with no ufer. Inspection is for grounding electrode only at this time. Back of garage has 20+ft of #4 bare that will be encased in concrete. Inspection is for cover of copper prior to pour. Phone #: ###-#### Inspection requested via web by Cevyn Recla Ok cover GEC on footing. Waiting for concrete
|