Permanent Service | 7/17/2019 | 7/18/2019 | 7/18/2019 | A | PASS |
Tom Saunders
|
|
|
Von is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen... p/s u/g new ok
|
Permanent Service | 7/17/2019 | 7/17/2019 | 7/17/2019 | P | NR |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Buster Bowen...contractor notified
|
Permanent Service | 7/16/2019 | 7/16/2019 | 7/16/2019 | P | FAIL |
James Ady
|
|
|
We need a permanent service and final on the new pedestal for the sign. Kim is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen 110.24 Available fault current shall be posted.
|
Final | 7/15/2019 | 7/16/2019 | 7/16/2019 | A | NR |
James Ady
|
|
|
We need a permanent service and final on the new pedestal for the sign. Kim is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen Need to energize and install photo cell before final can be given.
|
Electrical Rough-In | 6/26/2019 | 6/27/2019 | 6/27/2019 | A | PASS |
Tom Saunders
|
|
|
Underground cover for meter pedestal to power up pylon sign at the Fairview entrance at strip mall. Buster is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen...
rigid conduit from pedestal to monument sign ok to cover
|