Final | 7/24/2019 | 7/25/2019 | 7/25/2019 | A | PASS |
Tom Saunders
|
|
|
On-site contact: Mierins ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting... corrections made...labelling, disconnect, and OCPD ok
|
Final | 7/10/2019 | 7/11/2019 | 7/11/2019 | A | FAIL |
Tom Saunders
|
|
|
On-site contact: Mierins ###-#### Inspection requested via web by BRS Permitting.. clearance in front of disconnect needed fencing shall be cut down or removed giving 3ft of clearance in front and 30inches side to side this was discussed at rough in
|
Electrical Rough-In | 7/8/2019 | 7/9/2019 | 7/9/2019 | A | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by BRS Permitting...UL listed material verified...access at final needed...discussed clearance in front of disconnect and controls
|