Final | 9/3/2019 | 9/4/2019 | 9/4/2019 | A | PASS |
Tom Saunders
|
|
|
Ken Phone #: ###-####...ok to final
|
Electrical Rough-In | 8/5/2019 | 8/6/2019 | 8/6/2019 | A | PASS |
Tom Saunders
|
|
|
Ken Phone #: ###-####...rough in complete
|
Electrical Rough-In | 7/17/2019 | 7/18/2019 | 7/18/2019 | P | PASS |
Tom Saunders
|
|
|
Jim Phone #: ###-####.... approval for cover...requiring a 2nd rough inspection be scheduled before final to inspect make up of boxes...home currently being lived in
|
Conference | 7/16/2019 | 7/16/2019 | 7/16/2019 | A | PASS |
Tom Saunders
|
|
|
Ken Phone #: ###-####... discussed wiring of new bedroom and bathroom outlet requirements, wiring methods, AFCI, tamper resistant outlets, and basement area-no wiring needed made aware of need for mechanical and plumbing permit...not yet pulled pamphlet given
|
Electrical Rough-In | 7/15/2019 | 7/16/2019 | 7/16/2019 | A | CANC |
Tom Saunders
|
|
|
Ken Phone #: ###-####... needed required conference
|