Final | 11/1/2019 | 11/1/2019 | 11/1/2019 | P | PASS |
Eric Story
|
|
|
I should be on-site by 2 pm. Access is available throughout the day Phone #: ###-#### Inspection requested via web by Sean Patton Final ok-no Occ card to sign
|
Electrical Rough-In | 10/16/2019 | 10/16/2019 | 10/16/2019 | P | PASS |
Eric Story
|
|
|
Inspection for cover of two low voltage logo type signs on storefront north and south. Access available all day but I will not be on-site between 12;30-1:30 Phone #: ###-#### Inspection requested via web by Sean Patton Rough-in ok to cover for LV led lights
|
Electrical Rough-In | 7/9/2019 | 7/10/2019 | 7/10/2019 | A | PASS |
Eric Story
|
|
|
I will be onsite by 8. Approval for cover, walls and ceilings. Phone #: ###-#### Inspection requested via web by Sean Patton New vestible area in entry ok to cover hard lids and wall ok to cover
|