Final | 11/19/2019 | 11/19/2019 | 11/19/2019 | P | PASS |
Mark Moncarr
|
|
|
code to get in is 0-1-2 Phone #: ###-#### Inspection requested via web by Barbara Szurgot Ok final.
|
Electrical Rough-In | 10/1/2019 | 10/2/2019 | 10/2/2019 | A | PASS |
Mark Moncarr
|
|
|
There are 2 floor heat locations to inspect. Phone #: ###-#### Inspection requested via web by Barbara Szurgot Ok cover flr heat 2 baths main level.
|
Rough-In Permanent Service | 7/18/2019 | 7/18/2019 | 7/18/2019 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Barbara Szurgot Addition Rough in ok cover p/s o/h rec ok
|
Rough-In Permanent Service | 7/16/2019 | 7/17/2019 | 7/17/2019 | A | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Barbara Szurgot 110.14(D)- Grounding electrode termination in meter panel combo shall be torqued to spec. Termination in panel loose. 210.52(C)- Area to right of range is new counter top space in kitchen and shall have receptacle outlets installed. 250.110- Short runs of flexible metal conduit shall be bonded to equiment grounding conductor or terminate to a box with equipment grounding conductor terminated within. Floor heat boxes. 300.4- Where NM cable is run thru holes or channels that do not maintain 1 1/4" from framing surface they shall be protected from physical damage by nail plates or raceways. 408.7- Unused breaker spaces shall be closed by approved means prior to being energized.
|