Final | 11/5/2019 | 11/6/2019 | 11/6/2019 | A | PASS |
James Ady
|
|
|
Bldg. 80 upper dock bathroom remodel. Phone #: ###-#### Inspection requested via web by Steve Moss Final ok
|
Electrical Rough-In | 8/29/2019 | 8/30/2019 | 8/30/2019 | A | PASS |
James Ady
|
|
|
Bldg. 80 upper dock bathroom remodel Phone #: ###-#### Inspection requested via web by Steve Moss Rough in ok
|