Final | 2/14/2020 | 2/18/2020 | 2/18/2020 | A | PASS |
Daryl DeGrange
|
|
|
Call to meet // Daryl Phone #: ###-#### correction completed, final ok
|
Final | 2/13/2020 | 2/14/2020 | 2/14/2020 | A | FAIL |
James Ady
|
|
|
Daryl- if possible call prior Phone #: ###-#### 406.12. Tamper resistant receps required.(Garage, 1 recep in garage hall, Kitchen island GFCI Left side) 210.8 Kitchen counter receps shall be GFCI protected. (Recep right side near Micro) 422.31 Disc of permenantly installed appliances( Water heater Lock outs 3 40A breakers) 356.30 LFNMC shall be secured 12in from box and every 3ft. (A/C whip)
|
Electrical Rough-In | 9/9/2019 | 9/10/2019 | 9/10/2019 | A | PASS |
James Ady
|
|
|
Call 30 mins ahead for access- Daryl Phone #: ###-#### Bath receps are dedicated and can feed the fan above Tub as per 210.11C3 exeption. Corrections made rough in ok
|
Permanent Service | 9/10/2019 | 9/10/2019 | 9/10/2019 | P | PASS |
James Ady
|
|
|
Call 30 mins ahead for access- Daryl Phone #: ###-#### p/s o/h n ok
|
Electrical Rough-In | 9/5/2019 | 9/6/2019 | 9/6/2019 | A | FAIL |
Daryl DeGrange
|
|
|
Daryl Phone #: ###-#### NEC 225.32 Location. The disconnecting means shall be installed either inside or outside of the building or structure served or where the conductors pass through the building or structure.The disconnecting means shall be at a readily accessible location nearest the point of entrance of the conductors. NEC 210. 11(c) (3)(3) Bathroom Branch Circuits. In addition to the number of branch circuits required by other parts of this section, at least one 120-volt, 20-ampere branch circuit shall be provided to supply the bathroom(s) receptacle outlet(s). Such circuits shall have no other outlets.
|
Conference | 7/16/2019 | 7/17/2019 | 7/17/2019 | P | DONE |
James Ady
|
|
|
call before coming - HEGERLE DARYL Phone #: ###-#### covered alot of info, required circuits, wall spacing, counter receps, bath receps, AFCI, Garage receps, WP receps, Tamper resistant receps, Owner has handout
|