Final | 11/7/2019 | 11/7/2019 | 11/7/2019 | A | PASS |
Rock A. Hudson
|
|
|
Contact Josh Slater Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Final ok
|
Electrical Rough-In | 10/4/2019 | 10/4/2019 | 10/4/2019 | P | PASS |
Eric Story
|
|
|
Ceiling inspection over the escalator 5 lights Contact Josh Slater. Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Hard lid above escalator ok to cover
|
Electrical Rough-In | 9/26/2019 | 9/27/2019 | 9/27/2019 | P | PASS |
Rock A. Hudson
|
|
|
Ceiling cover inspection for 6 can lights in the walkway and 1 can light above the staircase landing. Contact Josh Slater. Thank you. Phone #: ###-#### Inspection requested via web by Cathy Duchek Asked to terminate old temp MC for an exit sign which was cut off even with wall. Either terminate in a box or abandon and remove. Thanks. Areas noted only rough in ok cover
|