Information based on query as of Thursday, June 27, 2024.
Permit Information
Permit NumberELE19-02670
StatusFinaled
Name ALLOWAY ELECTRIC CO INC
Site Address 800 W MAIN ST Unit: 210
Project Name 
Customer Number79048
ePlanReviewNo
Description
Alteration: 2nd Floor Gym Power
1) Provide and install (1ea) 100-amp 3-phase 120/240 panel with a
shunt trip main circuit breaker.
2) Provide and install (7ea) 120-volt 20-amp circuit breakers.
3) Provide and install (7ea) 120-volt 30-amp circuit breakers.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final7/31/20197/31/20197/31/2019PPASS
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Steven Ragan Final ok
Electrical Rough-In7/25/20197/25/20197/25/2019PPASS
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Steven Ragan
Grid rough in ok cover
Electrical Rough-In7/22/20197/23/20197/23/2019PFAIL
DetailsRock A. Hudson
Open ceiling inspection Phone #: ###-#### Inspection requested via web by Steven Ragan 300.11(B)- Support wires used to support cables shall be secured at both ends.
300.15- All cables shall terminate in a box. (2). 314.25- All boxes shall have covers. 12"x12".
330.30- MC cable supports shall not exceed 6' intervals and shall be secured with in12" of a box. 410.36(B)- Luminaires mounted to ceiling grid shall be secured to ceiling grid by machanical means or by approved clips.