Final | 7/31/2019 | 7/31/2019 | 7/31/2019 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Steven Ragan Final ok
|
Electrical Rough-In | 7/25/2019 | 7/25/2019 | 7/25/2019 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Steven Ragan Grid rough in ok cover
|
Electrical Rough-In | 7/22/2019 | 7/23/2019 | 7/23/2019 | P | FAIL |
Rock A. Hudson
|
|
|
Open ceiling inspection Phone #: ###-#### Inspection requested via web by Steven Ragan 300.11(B)- Support wires used to support cables shall be secured at both ends. 300.15- All cables shall terminate in a box. (2). 314.25- All boxes shall have covers. 12"x12". 330.30- MC cable supports shall not exceed 6' intervals and shall be secured with in12" of a box. 410.36(B)- Luminaires mounted to ceiling grid shall be secured to ceiling grid by machanical means or by approved clips.
|