Final | 12/10/2019 | 12/11/2019 | 12/11/2019 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Perez Final ok
|
Electrical Rough-In | 11/7/2019 | 11/8/2019 | 11/8/2019 | P | PASS |
James Ady
|
|
|
Ceiling inspection Phone #: ###-#### Inspection requested via web by Kevin Perez Ceilings through out ok to cover
|
Electrical Rough-In | 10/2/2019 | 10/3/2019 | 10/3/2019 | A | PASS |
Daryl DeGrange
|
|
|
New wall rough-in Phone #: ###-#### Inspection requested via web by Kevin Perez Rough-in ok cover walls
|
Electrical Rough-In | 10/3/2019 | 10/3/2019 | 10/3/2019 | P | PASS |
Daryl DeGrange
|
|
|
Exterior perimeter wall rough-in Phone #: ###-#### Inspection requested via web by Kevin Perez Rough-in ok cover Exterior perimeter walls
|
Electrical Rough-In | 7/19/2019 | 7/19/2019 | 7/19/2019 | P | PART |
Rock A. Hudson
|
|
|
New Wall Rough-in only Phone #: ###-#### Inspection requested via web by Kevin Perez Eastern training rm and small conference rm walls not built yet, rest of walls only rough in ok cover.
|