Final | 9/19/2019 | 9/20/2019 | 9/20/2019 | A | PASS |
Mark Moncarr
|
|
|
Please Call: Noah 20 minutes prior for access at ###-#### Phone #: ###-#### Inspection requested via web by Steven Meredith Ok final 3 LED lights on front porch and 1 side light.
|
Electrical Rough-In | 7/31/2019 | 8/1/2019 | 8/1/2019 | P | PASS |
Mark Moncarr
|
|
|
work is exposed front, west side and switching at back door! Phone #: ###-#### Inspection requested via web by Steven Meredith Ok cover front porch, also entry to side door W side.
|