Final | 12/22/2019 | 12/23/2019 | 12/23/2019 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Donald Sorrells Ok final. Ceiling in bedroom was not opened up. Lights are existing, no ARC fault.
|
Final | 12/19/2019 | 12/20/2019 | 12/20/2019 | A | NR |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Donald Sorrells
|
Electrical Rough-In | 9/20/2019 | 9/23/2019 | 9/23/2019 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Donald Sorrells Ok cover upstairs
|
Electrical Rough-In | 9/16/2019 | 9/17/2019 | 9/17/2019 | A | FAIL |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Donald Sorrells 1. Nail plates 2. Securing within 8" in various locations. 3. Support every 4-1/2 feet on vertical runs.
|
Conference | 8/2/2019 | 8/2/2019 | 8/2/2019 | P | DONE |
Mark Moncarr
|
|
|
Discussed code requirements for new master bed/bath. When floor was opened found numerous open splices above kitchen ceiling
|
Final | 8/1/2019 | 8/2/2019 | 8/2/2019 | P | CANC |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Donald Sorrells Should have been a conference.
|