Final | 7/20/2020 | 7/20/2020 | 7/20/2020 | P | PASS |
Tom Saunders
|
|
|
call for door code. Phone #: ###-#### Inspection requested via web by David McClellan...ok to final
|
Electrical Rough-In | 10/21/2019 | 10/22/2019 | 10/22/2019 | A | PASS |
Daryl DeGrange
|
|
|
trench out front only Phone #: ###-#### Inspection requested via web by David McClellan R/I ok cover trench to post light
|
Electrical Rough-In | 10/15/2019 | 10/15/2019 | 10/15/2019 | P | FAIL |
Tom Saunders
|
|
|
trench depth for monument light direct bury wire Phone #: ###-#### Inspection requested via web by David McClellan... 1) UF wire needs trench to proper depth...T300.5
|
Rough-In Permanent Service | 8/23/2019 | 8/23/2019 | 8/23/2019 | A | PASS |
Tom Saunders
|
|
|
corrections made rough ok to cover p/s u/g new ok
|
Electrical Rough-In | 8/21/2019 | 8/22/2019 | 8/22/2019 | A | FAIL |
Tom Saunders
|
|
|
Whole house and service Phone #: ###-#### Inspection requested via web by David McClellan...
**as per permit ELE19-01739..house accross street...UF wire installedwith no inspection...needs addressed**
1) all wires shall have a connector or attachment where enters box...bell box side of house...lot #108 and #113 accross street 2) 12/2 NMB and 14/2 NMB in same box and feeding a completed circuit...unable to verify circuit size and location in panel 3) nail plates required...mst bed switches and back door in dining...top plate 4) stack-it used to support/strap 8/3 NMB...exceeds manufacturers rating...12 and 14 NMB only 5) all metal boxes shall be grounded...LV panel
|