Final | 8/14/2019 | 8/14/2019 | 8/14/2019 | P | PASS |
Mark Moncarr
|
|
|
Micha Phone #: ###-#### Ok final. 400a, 2-2 pole 200a brkrs feeding 2 subpanels. A new 200a disc was installed outside for panel B. Panel B's brkr feeds disc off load side. This was the only way to do a line side connection as connections would have been inside meter base and not accessible. All labeling and fittings installed.
|
Electrical Rough-In | 8/9/2019 | 8/12/2019 | 8/12/2019 | A | PASS |
Mark Moncarr
|
|
|
We will be on site with all equipment Phone #: ###-#### Inspection requested via web by Jesse Simpson Ok cover. All items UL listed.
|