Final | 10/14/2019 | 10/14/2019 | 10/14/2019 | P | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Keith Chetta Corrections fixed..... final ok
|
Final | 10/10/2019 | 10/11/2019 | 10/11/2019 | A | FAIL |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Keith Chetta 210.8 All 120V recetpacles located within a bathroom shall have GFCI protection 210.70 (a)(2) (2) Dwellings units shall have a switch for egress for all exterior exits 110.25 Lockable Disc for all hard wired appliances
|
Electrical Rough-In | 8/29/2019 | 8/30/2019 | 8/30/2019 | A | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Keith Chetta...rough ok to cover...required outlets added where walls open
|
Permanent Service | 8/7/2019 | 8/8/2019 | 8/8/2019 | A | PASS |
Eric Story
|
|
|
The ground rods are buried underneath compact gravel. I have pictures of the ground rods if you need to see them. They are pouring concrete in the morning at 10 AM. Phone #: ###-#### Inspection requested via web by Keith Chetta p/s o/h n ok
|