Electrical Rough-In | 8/9/2019 | 8/9/2019 | 8/9/2019 | P | PASS |
Daryl DeGrange
|
|
|
Justin Phone #: ###-#### Rough-in ok cover trenches to service location and to detached garage, pump house, patio structure, pool equipment building.
|
Conference | 8/9/2019 | 8/9/2019 | 8/9/2019 | P | DONE |
Daryl DeGrange
|
|
|
Justin Phone #: ###-#### Discuss limitations of GC contractor licenses. NEC 352.10(F) Schedule 40 conduit below ground and schedule 80 above ground for electrical PVC installation.
|