Final | 2/4/2020 | 2/4/2020 | 2/4/2020 | P | PASS |
James Ady
|
|
|
The cubicles were installed and the facility is ready for final inspection. Please call Paul if there are any questions ###-####. Phone #: ###-#### Inspection requested via web by Joe McLean furniture set final ok
|
Final | 1/23/2020 | 1/23/2020 | 1/23/2020 | P | PART |
James Ady
|
|
|
The fire alarm has been installed and the facility is ready for final inspection. Please contact Paul with any questions or issues ###-####. Phone #: ###-#### Inspection requested via web by Joe McLean TCO only will need to call for Final after Cubicals have been set up.
|
Final | 1/13/2020 | 1/15/2020 | 1/15/2020 | P | NR |
James Ady
|
|
|
We need a final inspection for office building SPE/David Berry. Please call Paul ###-#### when headed to project, or with any questions. Phone #: ###-#### Inspection requested via web by Joe McLean
|
Electrical Rough-In | 1/15/2020 | 1/15/2020 | 1/15/2020 | P | PASS |
James Ady
|
|
|
We need a final inspection for office building SPE/David Berry. Please call Paul ###-#### when headed to project, or with any questions. Phone #: ###-#### Inspection requested via web by Joe McLean Disp. Pigtail, W/H Disc, Electrical room Switches.(Change OC sensor to Single pole.), IT room receps, E wall conference room Facing open office recep dead,Bath receps DOuble GFCI(Line side all GFCIS), Spark rings needed on Restroom switches, NE T.I space recep RT of sink GFCI, Space hot checked and ok for furniture set up only. Ceiling ok to cover
|
Permanent Service | 12/5/2019 | 12/6/2019 | 12/6/2019 | A | PASS |
James Ady
|
|
|
Thank you Phone #: ###-#### Inspection requested via web by CHRIS CARMINE Corrections made p/s u/g n ok
|
Permanent Service | 12/3/2019 | 12/4/2019 | 12/4/2019 | A | FAIL |
James Ady
|
|
|
Thank you. Phone #: ###-#### Inspection requested via web by CHRIS CARMINE no fault current, no ufer access. Left message for contractor 12/3. Needed grounding bars installed in sub panels. Not all corrections made
|
Permanent Service | 12/2/2019 | 12/3/2019 | 12/3/2019 | A | FAIL |
James Ady
|
|
|
Thank you.. Phone #: ###-#### Inspection requested via web by CHRIS CARMINE 110.24 Available fault current shall be posted. 250.68A. Connection to grounding electrode shall be accessible. (Mudring needed at ufer. 250.104 A 1 Metal water piping shall be bonded(Fininsh water line connections)
|
Electrical Rough-In | 11/8/2019 | 11/8/2019 | 11/8/2019 | P | PASS |
James Ady
|
|
|
Thank you. Phone #: ###-#### Inspection requested via web by CHRIS CARMINE Rough in walls only ok to cover
|
Electrical Rough-In | 9/17/2019 | 9/18/2019 | 9/18/2019 | P | PASS |
James Ady
|
|
|
Thank you. Phone #: ###-#### Inspection requested via web by CHRIS CARMINE 2in conduit for street light ok to cover
|
Conference | 8/13/2019 | 8/14/2019 | 8/14/2019 | P | CANC |
James Ady
|
|
|
underground // Chris Phone #: ###-#### needed rough in
|
Electrical Rough-In | 8/14/2019 | 8/14/2019 | 8/14/2019 | P | PASS |
James Ady
|
|
|
underground // Chris Phone #: ###-#### ufer ok
|